20140410_100416

Lake Oswego Tigard Water Partnership – Finished Water Pipeline – Schedule 5

Work on this project consisted of the following: • Construct approximately 5,442 LF of 42-inch diameter and approximately 11,154 LF of 36-inch diameter welded steel potable water pipeline, including valves, fittings, and appurtenances. • Construct approximately 1,220 LF of 24-inch diameter ductile iron potable water pipeline, including valves, fittings, and appurtenances. • Construct approximately 260 [...]

IMG_3336

Eugene Water & Electric Board (EWEB) – Willamette River Pipeline Crossing Rehabilitation

On August 17, 2012 Emery & Sons Construction was awarded the Willamette River Pipeline Crossing Rehabilitation Project. The work involved with this project included the installation of 1,000 linear feet of 30-inch diameter welded steel pipe and 500 linear feet of 36-inch diameter welded steel water pipeline fabricated from steel plate to AWWA standards. The [...]

2 Fusing Pipe

City of Junction City – 2013 I&I Reduction Project, Schedules A&B

This project for the City of Junction City required the replacement of approximately 8,500 lineal feet of gravity sewer mainline and service laterals. Sewer mains and laterals were replaced by a combination of pipe bursting and open cut construction. This project also included the replacement of associated manholes and railroad bore crossings where PVC gravity [...]

photo - Copy

City of Portland – Ash Creek (West of S.W. 57th Ave.) Sanitary Sewer Rehabilitation Project

For several years, the City of Portland worked to stop sewer overflows to South Ash Creek during wet weather. In 2006, the City installed a temporary bypass pipe on the surface near the creek to prevent overflows. Beginning in October, 2013 crews from Emery & Sons repaired portions of the sewer, removed the temporary pipe [...]

Bypass - Copy

City of Portland – S.W. Vincent / S.W. Capitol Hwy. Sewer Replacement

Emery & Sons Construction started construction in October, 2013 on a project to replace a cracked and deteriorated 24-inch sewer pipe built in 1929 underneath S.W. Capitol Highway and Terwilliger Blvd. Jack and bore construction was utilized to replace the pipe underneath S.W. Capitol Highway. Emery & Sons excavated a launch shaft in the pedestrian [...]

Pacific Foundation - 2

City of Portland – South Airport Basin-Phase IV Pump Stations

This project consisted of construction two new pump stations and associated site work and frontage improvements for the City of Portland. The scope of work included, but was not limited to: At the N.E. 42nd Ave. Pump Station: Design and construction of a nearly 40-foot deep caisson with tremie seal to serve as a new [...]

20130523_140059_resized_1_resized

City of Portland – Overlook Sewer Replacement Project

The Overlook Sewer Replacement Project involved the replacement, and rehabilitation of combination sewer, manholes and inlets along 43 streets in North Portland. Due to the densely populated commercial and residential areas, extensive public outreach and planning was required to minimize disturbance to neighborhoods, businesses, and the travelling public. Construction included a variety of techniques including [...]

30 Santite (2)

City of Beaverton – Arctic Drive to 107th Avenue Sanitary Sewer and S.W. 107th Avenue Storm Drainage Project

Major items of construction included: • Construction of approximately 1,500 linear feet of new 6-inch and 8-inch sanitary sewer lines by open trench excavation. • Installation of approximately 1,750 linear feet of new 8-inch sanitary sewer line by pipe bursting of the existing 8-inch asbestos cement of 8-inch unreinforced concrete pipes. • Slip-lining 265 linear [...]

20130829_132019

City of Portland – Upper Hillsdale Sub-Basin RDII Pilot Project

This project involved rehabilitation of approximately 8,700 lineal feet of 8-inch pipe by insertion of a cured-in-place pipe liner, installation of approximately 200 lineal feet of 8-inch PVC pipe by open cut methods, and roughly 200 lineal feet of 8-inch pipe by pipe bursting. This project also evaluated the condition of and locations of all [...]

photo 2

Cordon Road Apartments Public Improvements

Work on this project consisted of public improvements for the Cordon Road Apartments in Salem, OR. Major components of work included the following: Sanitary sewer: Installation of 15-inch PVC (at depths over 20’), 8-inch PVC, 6-inch PVC, and 4-inch PVC (15”-400 LF, 8”-1,200 LF, 6”-67 LF, 4”-300 LF); Installation of manholes; Dewatering.  Storm work: Installation [...]