Deschutes Valley Water District – 24-inch Steel Pipeline (Opal Springs Project)

The Deschutes Valley Water District – 24-inch Steel Pipeline-Opal Springs Project consists of the installation of 2,361 linear feet of 24 inch welded steel pipe. Also included are five roadway storm water culverts, a 24 inch BFV, a 12 inch BFV, two three inch high pressure bypasses with necessary appurtenances and approximately sixty feet of […]

Clean Water Services – Onion Flat Trunk Sewer Upgrade

Emery & Sons was responsible for the installation of 298 linear feet of 42-inch sanitary sewer pipe, 4749 linear feet of 27-inch sanitary sewer pipe, 112 linear feet of 30-inch sanitary sewer pipe, 14 linear feet of 8-inch sanitary sewer pipe, 15 manholes, 236 linear feet of trenchless crossing and casing under Highway 99, dewatering […]

City of Portland – Piedmont Sewer Rehabilitation Projedt

The Piedmont Sewer Rehabilitation Project involves the new construction, replacement, and rehabilitation of combination sewer, sanitary sewer, and manholes in North Portland near N Lombard St. Work shall include, but not limited to: Construct, maintain, and remove temporary work zone traffic control measures. Construct, maintain, and remove erosion control measures. Construct, maintain, and remove temporary […]

City of Portland – 2016 Local Improvement Districts Project

The 2016 Local Improvement Districts Project involves the construction of street improvements along the following streets: NE Couch Ct: NE 3rd Ave – NE Couch St LID SW 45th Ave and California St LID Work shall include, but not be limited to: Perform all removal of structures and obstructions, clearing and grubbing, and earthwork operations. […]

City of Grants Pass – Webster Lift Station

Emery & Sons was responsible for the Construction of the Webster Lift Station No. 1, including below-grade wet well and valve vault, inlet gravity sanitary sewer pipeline, and above-grade control panel, backflow preventer, and associated site work. The Work also consists of decommission and partial demolition of the existing Webster Lift Station No. 1, pavement […]

City of Newberg – Villa Road Improvements Project

Emery & Sons was responsible for the installation of 272 linear feet of large diameter plate arch culvert, relocation and installation of 330 linear feet of 8 inch sanitary sewer and manholes, relocation of existing 8 inch ductile iron waterline, relocation of existing storm piping, construction of (4) headwalls, Ultra Block retaining wall system, fish […]

City of McMinnville – Cook School Sanitary Sewer Rehabilitation

Emery & Sons was responsible for the construction of approximately 9,382 linear feet of sanitary sewer mainline ranging from 6 to 18 inches in diameter and installation of approximately 1,675 linear feet of new storm sewer ranging 10 to 15 inches in diameter. Construction methods utilized for the improvements will include open trench excavation (4”-2,650 […]

Grand Prairie Crossing Phase 1 & 2 Subdivision

Emery & Sons was responsible for the construction of 97 lots and 3 tracts, including all earthwork, water, storm and sewer utilities, franchise utilities, construction of a 50’ bridge set on piles, a 12” waterline bore under the existing creek, tree removal, clearing and grubbing, curb and sidewalk construction, asphalt paving, and signage. Owner: Hudson […]

Albany Heights Phase III Subdivision

Emery & Sons was responsible for the construction of 51 lots, including all earthwork, water with a 12”x8” hot tap on main line, storm and sewer utilities, franchise utilities, tree removal, clearing and grubbing, curb and sidewalk construction, asphalt paving, and signage. Owner: MBBH Development Engineer: Multi-Tech Engineering Location: Albany, Oregon Completion Date: 2016