Trenchless Construction

City of Portland – Hollywood-Grant Park Sewer Rehabilitation Project

The Hollywood-Grant Park Sewer Rehabilitation Project involved the repair and rehabilitation, and new construction of combination sewer, manholes, inlets, and service laterals in N.E. Portland near Hollywood, Grant Park, Rose City Park, Alameda, and Beaumont-Wilshire. Work shall include, but not be limited to: Construct, maintain, and remove temporary work zone traffic control measures. Construct, maintain, […]

City of Portland – Piedmont Sewer Rehabilitation Projedt

The Piedmont Sewer Rehabilitation Project involves the new construction, replacement, and rehabilitation of combination sewer, sanitary sewer, and manholes in North Portland near N Lombard St. Work shall include, but not limited to: Construct, maintain, and remove temporary work zone traffic control measures. Construct, maintain, and remove erosion control measures. Construct, maintain, and remove temporary […]

City of McMinnville – Cook School Sanitary Sewer Rehabilitation

Emery & Sons was responsible for the construction of approximately 9,382 linear feet of sanitary sewer mainline ranging from 6 to 18 inches in diameter and installation of approximately 1,675 linear feet of new storm sewer ranging 10 to 15 inches in diameter. Construction methods utilized for the improvements will include open trench excavation (4”-2,650 […]

City of Corvallis – 2015-16 Sewer Rehabilitation Project

On April 3, 2015, Emery & Sons Construction Group was awarded the 2015-16 Sewer Rehabilitation Project. The purpose of this project was to replace a portion of the City’s failing Sanitary Sewer system via pipe bursting methods. The scope of work included the following: 2,902 LF of 8” Pipe Bursting and Replacing with 10” HDPE […]

City of Portland – Kenton Sewer Rehabilitation

Emery & Sons began construction in late summer 2014 on the Kenton Sewer Repair Project. This project replaced about 7,000 LF feet of public sewer pipes, that were between 80 and 90 years old and failing due to age. The work included repairing about 2,200 feet of existing service laterals that connect houses and businesses from […]

City of Portland – Albina Pump Station Force Main CIPP Rehabilitation

This contract included CIPP lining of an existing sewer force main, replacement of existing force main, construction of a vacuum valve vault, construction of new pipe and a new manhole over an existing sewer pipe, and construction of manhole, pipe and valve connection between two existing pipelines. Restoration, paving and traffic signal loop connection are […]

City of Corvallis – 2014-15 Sewer Rehabilitation

The work consists of pipe bursting approximately 600 linear feet of 6-inch, 2,100 linear feet of 8-inch and 60 linear feet of 12-inch sanitary sewer pipe through existing sewers and replacement with 6-inch, 8-inch, 10-inch and 12-inch HDPE pipe, locating, excavating, video inspecting, rerouting and/or reconnecting sewer service laterals, removing/replacing sanitary sewer manholes, rehabilitating manholes, […]

Oregon State Penitentiary (OSP) – Emergency Sewer Repairs

Sanitary sewer system improvements of Line A-1 that serves as the main sewer for “A” -Block, “C”-Block, “D”-Block and the Culinary building. This work was performed primarily inside the secured perimeter of the correctional facility and required special security measures per ODOC requirements. Associated work included: Full replacements of sections of sanitary sewer line and […]

City of Junction City – 2013 I&I Reduction Project, Schedules A&B

This project for the City of Junction City required the replacement of approximately 8,500 lineal feet of gravity sewer mainline and service laterals. Sewer mains and laterals were replaced by a combination of pipe bursting and open cut construction. This project also included the replacement of associated manholes and railroad bore crossings where PVC gravity […]