City of Newberg – Phase 1 Reuse Water System

The work involved with this project includes modifying the reclaimed water wet well for the addition of two new raw water feed pumps. This water will be pumped to a newly constructed 62’ X 56’ HBU Reuse Building. The new reuse facility will contain a pressurized membrane filtration system, membrane filter effluent pumps and associated ancillary systems. The reuse water will then be conveyed through 7000 LF of newly constructed 14” mainline from the WWTP to the Chehalem Golf Course.

aug 13 2007 job photos 024 aug 13 2007 job photos 027 10-16-07 016 10-16-07 024 Photos 12-20-07 002 Misc Photos 073 Misc Photos 037 Misc Photos 039 Misc Photos 034 Misc Photos 035 Misc Photos 036 Misc Photos 031

Owner: City of Newberg

Engineer: CH2M Hill

Location: Newberg, Oregon

Completion Date: 2008