City of Redmond – WPCF Modifications

This project included construction of a new headworks channel, new screenings building new biofilter and installation of two new rotary drum screens and associated conveyors. Work also included modifications to the existing screening building and removal of the existing screening equipment. A new 60’ diameter clarifier, modifications to two existing clarifiers, electrical and control upgrades, modifications to the existing de-chlorination system and the installation of 18000 LF of 24” final effluent conveyance piping were also include in the project.  Project was funded by Department of Environmental Quality Clean Water State Revolving Funds.

Redmond 1-9-08 103 Redmond 1-9-08 104 Redmond 1-9-08 105 Redmond 1-9-08 108 Redmond 1-9-08 109 Redmond 1-9-08 110 Redmond 1-9-08 091 Redmond 1-9-08 092 Redmond 1-9-08 093 Redmond 1-9-08 094 Redmond 1-9-08 096 Redmond 1-9-08 097 Redmond 1-9-08 099 Redmond 1-9-08 101

Owner: City of Redmond

Engineer: Brown & Caldwell

Location: Redmond, Oregon

Completion Date: 2009